Surface treatment plants

May 2008
Fast flow of materials when coating and drying heavy components
Liebherr explores new paths with a new painting facility for large parts for hydraulic excavators: The parts that weight up to 20 tons are suspended freely from a track that is attached to the ceiling to bring them through the facility. A special solution with regard to the drive provides optimum protection against explosion in the painting and drying cabins.
Display PDF ...


