Pullers

The surface of the precast concrete part facing away from the shuttering is smoothed directly after the concreting by the puller. This is done by installing the puller board as a separate machine or on the concrete distributor, pulled over the surface of the concrete in the lengthways direction of the pallet.
Your contacts
for pullers
Frank Schlotter
Tel. +49 (0)7134 52 259
Fax +49 (0)7134 52 205
frank.schlotter(at)vollert.de
Philippe Marrié
Tel. +49 (0)7134 52 230
Fax +49 (0)7134 52 205
philippe.marrie(at)vollert.de
Steffen Schmitt
Tel. +49 (0)7134 52 239
Fax +49 (0)7134 52 205
steffen.schmitt(at)vollert.de



