Pallet circuit

The production of precast concrete parts is done on shuttering pallets that are transported in a circuit from station to station. The precast parts are primarily flat elements such as floors (floor slabs and hollow core slabs) and walls (solid walls, double walls, sandwich elements), but also special parts or other precast concrete parts.
This procedure makes it possible for the machines, auxiliary items and materials to be used at the right place and hence to increase the production amounts, quality and productivity while at the same time reducing manufacturing costs – a pallet circuit is unbeatable here.
As a rule, the amount of investment is higher when compared to stationary plants, but this can be recouped very quickly with the corresponding performance. Pallet circuits can be set up to any desired degree of automation:
everything from simple basic solutions set up in a modular way, to highly complex multifunctional plants.
Your contacts
for pallet circuits
Frank Schlotter
Tel. +49 (0)7134 52 259
Fax +49 (0)7134 52 205
frank.schlotter(at)vollert.de
Philippe Marrié
Tel. +49 (0)7134 52 230
Fax +49 (0)7134 52 205
philippe.marrie(at)vollert.de
Steffen Schmitt
Tel. +49 (0)7134 52 239
Fax +49 (0)7134 52 205
steffen.schmitt(at)vollert.de
References

February 2010
Flagship Factory for the Precast Industry of the Kingdom of Saudi Arabia
Being the official production start date of Alabniah Precast Concrete Buildings Factory the 1st of January 2010 is a date not only starting a new decade but also a date where the Saudi Arabian precast concrete industry sees the most advanced and largest factory of its kind in the Kingdom starting off. The factory located in the Second Industrial Area of Dammam is the first of its kind in Saudi Arabia offering the combined advantages of state of the art modern production technology, high capacity and wide product range to deliver complete building
systems and precast components into the market.

February 2010
Solid and double walls from one source
In February 2010, the first double wall production line was put into operation at company Trabis located in Yecla in the region of Murcia in the south-east of Spain. The solid wall production line installed three years ago by Vollert and their partners was expanded in such a manner that it is now possible to manufacture also double walls in a cost-effective and efficient way besides the solid walls being manufactured so far.

May 2008
Initial commissioning of a new ceiling and wall production system
In mid-2008, DSK Block put in operation the latest production facility for precast concrete components in St Petersburg. DSK Block belongs to the LSR Group, one of the leading companies of its type in north-west Russia, and has set itself the goal of a reaching an output capacity of 750,000-square-metre residential area annually by 2011 through its two plants for the manufacture of precast concrete components. In order to achieve this, a total of €19 million was invested in the first stage to allow an annual production of 180,000 m³ of precast concrete components.
Display PDF...

March 2008
Gocrete: a company gets in shape for the future
In March 2008, Gocrete put into operation a state-of-the-art production plant for precast concrete components in the Perth area, the most modern in Western Australia. In addition to floor slabs, solid walls are also produced in a very limited space and in an economical fashion on the basis of the latest findings concerning safety at work.
Display PDF ...
Product video
| Solid walls and facade elements | Double walls and floor slabs |